ACOUSTIC BEARING CHECKER
Acoustic Emission Technology (AE)

LOW SPEED
Low rotational speed of operation (as low as 0.1RPM)

LUBRICANT
Indicates lack of lubricant/dirty lubricant.

FFT&WAVE FORM
Real Time FFT&Wave form of Bearing Condition

ISO22096
Acoustic Emissions (AE) Technology
ACMA-022A
AE CREST FACTOR EARLY DAMAGE WARNING
ASSIGNING PRIORITY LEVELS
___No abnormal trends or performance are noted at the time of data collection, thus no action is typically recommended at this time, and acquisition is scheduled for the next calendar date.
ACTION: No Action required.
___Typically employed when a change in machine performance or mechanical wear mechanism is detected, however, trends need to be observed to determine if the machine stabilizes, or if operational methods is causing the excursion. It is recommended to be re-greased and complete a lubrication oil change. Typically, measurement frequency is doubled during this period
ACTION: Re-greasing or Lubrication Oil change then re-inspection.
___Machinery data indicates operation is in the rough category. Plans should be made to arrange repair outage or replacement at the first availability. Vibration, oil, temperature and operational data should be examined to determine dynamic data trends and the root cause of problem. This allows for systemic failure repair (for example, bearings, lubrication, etc.), and allows the source of the faults to be identified. Repairs and operational options (imbalance, misalignment, excessive machine speed, coolant problems, etc.) may be used to prolong machinery availability and minimize loss of production.
ACTION: - Apply FFT analysis to identify the problem.
_________- Prolong the machines life by adding grease or changing lubrication oil.
_________- Using alternative CBM technique to confirm the machine degradation.
___Machinery data indicates that failure is imminent. Machinery requires immediate attention, and the immediate repair shutdown should be seriously considered. During with this level of damage, the machine should be monitored a minimum of once per day.
ACTION: - Follow up inspection and trending more frequently.
_________- Apply FFT analysis to identify the problem.
_________- Predict and confirm by alternative techniques.
_________- Consider how best to replace the defective part as soon as economically practical.